We map your floor.
Presses with their tonnage and tie-bar gap, moulds with their cavities and shot counts, robots, dryers and the QC table — placed where they stand, by our engineers or your own team with the Cystems app.
Reads the signals your presses and systems already send.
Presses with their tonnage and tie-bar gap, moulds with their cavities and shot counts, robots, dryers and the QC table — placed where they stand, by our engineers or your own team with the Cystems app.
Shot counters, hourly sheets and your ERP feed the model, so it runs on your real cycle times, rejects and changeovers. One private workspace for the whole plant, with every user included.
A new 8-cavity tool, a switch to ABS, a third shift or a bigger press — run it on the model and see the week it gives you, and the one station that holds it back.
Tell the model a new tool is coming and it plays a full week of moulding, picking, inspection, printing and packing with it. The step that saturates first is your new bottleneck — and the fix comes with what it is worth.
Simulated six-day week, three shifts. Illustrative 28 mm closure cell on a 250-tonne press.
Cy reads your drawings, process sheets, scrap codes and shot counters and answers from the live model — why press 4 slowed, which mould is due for service, what a dark-to-light change will cost. It runs on servers you choose.
When a tool starts flashing at one site, its sister moulds at every other site are watched for the same signs. Settings, fixes and changeover tricks travel with the mould, not with the person who found them.
Press bays by tonnage, the mould store by crane reach, the dryer room on the resin route. Run a month of your order book through it and move walls on screen, not on site.
Case study
An injection moulding plant making two-wheeler and cycle parts, tool sleeves and chain covers for 25 customers. Before Cystems the plant ran on a product master workbook, a printed hourly report and a separate billing register — three versions of the same parts, none of them connected to the presses.
of GST that would have been over-charged. The old master put 34 cycle parts under HSN 87141090 at 18%; the plant's own books bill them at 5%, on ₹23.5 lakh of sales. Caught before a single invoice went out.
Figures from Star Enterprises' own product master and sales registers, April–October 2026.
A paid pilot on one press cell or one product family, measured against your own numbers. Then a yearly plan per plant with support included, so the whole floor can use it. Scope a pilot →